• the first 6 houses of the complex were built and fully inhabited;
• a now working kindergarten was built on the territory of the residential complex;
• finished adjacent territory (playground, recreation area, fountain);
• security system and video surveillance installed;
• the last seventh stage was built and commissioned. The following works are currently being carried out there:
- heating radiators, gas meters and boilers are already available in all apartments;
- water meters have been installed in the entrances;
- all interior works (finishing) have been completed in the entrances;
- elevators have been installed, which are currently being inspected by representatives of technical supervision;
- fire and ventilation works are being completed in the underground parking lot;
- landscaping work will get started on the adjacent area the other day.