Array
13-A,B, Yablyneva street
Apartments
216
Floors
10
Development started
july, 2015
Finished
september, 2016
  • Comfort of country houses
  • Profitable investment
  • Atmosphere of rest
Technology

This is a brickhouse. Floor decks are built using the armored concrete slabs.

Walls

Exterior walls are built of the white silicate brick. Exterior walls are 380 mm wide. Interior walls are built of 120 mm wide gas-concrete blocks.

Windows

Metal and plastic 5-chamber dual pane windows with window sills. Frame system – KBE Optima. Manufacturer – GLASSO.

Heating

Individual heating in every apartment: Western Quasar double-pressure gas boiler and metal radiators with temperature control.

Floor view
Number of rooms
rooms
м²
Choosing an apartment
  • Residential properties
  • Commercial property
Number of rooms
Gross area, M²
Additionally
Type
Gross area, M²
Additionally
Searching results:
  • Rooms: 1
  • Gross area: 37.31 м2
  • Living space: 20.65 м2
  • Rooms: 1
  • Gross area: 40.7 м2
  • Living space: 17.01 м2
  • Rooms: 2
  • Gross area: 59.75 м2
  • Living space: 30.1 м2
  • Rooms: 2
  • Gross area: 59.75 м2
  • Living space: 30.1 м2
Construction progress
August
2017
January
2017
December
2016
November
2016
October
2016
September
2016
August
2016
July
2016
June
2016
May
2016
April
2016
March
2016
February
2016
January
2016
December
2015
November
2015