Warming Up: Autumn News from RC “Shchaslyvyi” in Lviv

21.09.2017

RC “Shchaslyvyi” on Bihova Street enters a new construction stage. To keep you updated on the situation, let us tell you about it in more details.

Facade insulation works are running in the first construction phase. Here we use building and construction materials with proved heat insulation characteristics, which are crucial for the construction of residential houses. Exterior walls of the building are built of clay blocks and have a 13-cm mineral wool layer for better insulation. Moreover, our houses are equipped with individual heating systems. Every apartment will have a double-pressure gas boiler and radiators with temperature control. This means that you will be able to select and maintain the level of temperature you want in your apartment. Five-chamber dual pane metal and plastic windows with КBE Optima frame system, which we install in every apartment, secure one more heat preservation factor.

In line with the heat insulation and windows placement works we are also finishing the construction of interior partition walls in apartments on the last floors. Cement screed and plastering works are already completed on the 4th floor.

Take care to have a warm and cozy housing in the comfort class development today. In case of any questions regarding apartment purchase, contact us at (‎032) 229-52-72, (‎067) 235-18-37, or come to our sales office at 26 Chaikovskoho Str. Come over and we will make the best offer to you!

RC “Shchaslyvyi” – apartments for you!