Array
9-G,D, Yablyneva street
Apartments
179
Floors
10
Development started
august, 2016
Finished
december, 2017
  • Comfort of country houses
  • Profitable investment
  • Atmosphere of rest
Technology

This is a brickhouse. Floor decks are built using the armored concrete slabs.

Walls

Exterior walls are built of the white silicate brick; red brick is used for balconies. Exterior walls are 380 mm wide. Interior walls are built of gas-concrete blocks.

Windows

Metal and plastic 5-chamber dual pane windows with window sills. Frame system – KBE Optima. Manufacturer – GLASSO.

Heating

Individual heating in every apartment: Western Quasar double-pressure gas boiler and metal radiators with temperature control.

Floor view
Number of rooms
rooms
м²
купить квартиру в софиевской борщаговке Яблуневая 7-A
Choosing an apartment
  • Residential properties
  • Commercial property
Number of rooms
Gross area, M²
Additionally
Type
Gross area, M²
Additionally
Searching results:
  • Rooms: 2
  • Gross area: 70.03 м2
  • Living space: 37.23 м2
  • Rooms: 1
  • Gross area: 40.32 м2
  • Living space: 17.07 м2
  • Rooms: 1
  • Gross area: 38.03 м2
  • Living space: 15.15 м2
  • Rooms: 2
  • Gross area: 61.05 м2
  • Living space: 28.3 м2
Construction progress
  1. September 2017
  2. August 2017
  3. July 2017
  4. June 2017
  5. May 2017
  6. April 2017
  7. March 2017