Array
61, Shastlyva street
Apartments
85
Floors
5
Development started
february, 2014
Finished
september, 2014
  • Comfort of country houses
  • Profitable investment
  • Atmosphere of rest
Technology

This is a brickhouse. Floor decks are built using the reinforced concrete belts every three floors.

Walls

Both exterior and interior walls of the house are built of the red brick with high heat insulation and are insulated with mineral wool and foam panels.

Windows

Metal and plastic 5-chamber dual pane windows with window sills. Manufacturer –Rehau, Wintech, KBE.

Heating

Individual heating in every apartment: Western Quasar double-pressure gas boiler and metal radiators with temperature control.

Choosing an apartment
  • Residential properties
  • Commercial property
Number of rooms
Gross area, M²
Additionally
Type
Gross area, M²
Additionally
Searching results:
  • Rooms: 1
  • Gross area: 53.02 м2
  • Living space: 34.61 м2
  • Rooms: 3
  • Gross area: 84.37 м2
  • Living space: 34.61 м2
  • Rooms: 2
  • Gross area: 64.55 м2
  • Living space: 30.44 м2
Construction progress