Array
Array
Array
Array
Array
11, Yablyneva street
Apartments
360
Floors
10
Development started
february, 2018
Finished
december, 2019
  • Comfort of country houses Comfort of country houses
  • Profitable investment Profitable investment
  • Atmosphere of rest Atmosphere of rest

Technology

The house is built based on the cast-in-place concrete frame technology, which is a long-lasting, reliable, and solid construction method.

Walls

External walls are raised from ceramic bricks (250 mm), insulated by thermal foam plastic (100 mm). Triple-layer inter-apartment partition walls (250 mm): gas concrete block 100 mm + mineral wool board 50 mm + gas concrete block 100 mm. Partition walls – gas concrete block 100 mm.

Windows

Metal and plastic 5-chamber dual pane windows with window sills.

Heating

Individual heating in every apartment: Western Quasar double-pressure gas boiler and metal radiators.

Apartments in the house at the st. 11, Yablyneva street

  • Residential properties
  • Commercial property
Number of rooms
Gross area, M²
Type
Gross area, M²
Searching results:
  • Rooms: 1
  • Gross area: 41.52 м2
  • Living space: 15.89 м2
  • Rooms: 1
  • Gross area: 41.87 м2
  • Living space: 15.89 м2
  • Rooms: 1
  • Gross area: 41.54 м2
  • Living space: 15.89 м2
  • Rooms: 1
  • Gross area: 40.09 м2
  • Living space: 14.95 м2
Construction progress