Array
Array
Array
11, Yablyneva street
Apartments
360
Floors
10
Development started
february, 2018
Finished
december, 2019
  • Comfort of country houses Comfort of country houses
  • Profitable investment Profitable investment
  • Atmosphere of rest Atmosphere of rest

Technology

The house is built based on the cast-in-place concrete frame technology, which is a long-lasting, reliable, and solid construction method.

Walls

External walls are raised from ceramic bricks (250 mm), insulated by thermal foam plastic (100 mm). Triple-layer inter-apartment partition walls (250 mm): gas concrete block 100 mm + mineral wool board 50 mm + gas concrete block 100 mm. Partition walls – gas concrete block 100 mm.

Windows

Metal and plastic 5-chamber dual pane windows with window sills. Frame system – KBE Optima.

Heating

Individual heating in every apartment: Western Quasar double-pressure gas boiler and metal radiators with temperature control.

Apartments in the house at the st. 11, Yablyneva street

  • Residential properties
  • Commercial property
Number of rooms
Gross area, M²
Type
Gross area, M²
Searching results:
  • Rooms: 1
  • Gross area: 41.52 м2
  • Living space: 15.89 м2
  • Rooms: 1
  • Gross area: 41.87 м2
  • Living space: 15.89 м2
  • Rooms: 1
  • Gross area: 41.54 м2
  • Living space: 15.89 м2
  • Rooms: 1
  • Gross area: 40.09 м2
  • Living space: 14.95 м2
Construction progress
March
2019
February
2019
January
2019
December
2018
November
2018
October
2018
September
2018
August
2018
July
2018
June
2018
May
2018
April
2018
March
2018
February
2018
January
2018